(022) 25942515 /
  • Follow Us -

Generator Engine Overhauling Course

  • 1) Personal Safety and Safe Working Practices On Board Vessel.
  • 2) Removal of Cylinder Head and Piston Connecting Rod Assembly.
  • 3) Removal of Cylinder Liner with the Jacking Tools.
  • 4) Cleaning and Overhauling Of Cylinder Head and Piston Connecting Rod Assembly.
  • 5) Calibration Of Cylinder Liner, Piston, Piston Rings, Ovality Check Of Connecting Rod Etc.
  • 6) Crack Detection Test of Connecting Rods, Overhauling Of Cylinder Head Valves, Starting Air valves, Fuel Ejector Valves.
  • 7) Overhauling Of Fuel Injection Pump, Attached JCW Pump.
  • 8) Crank Shaft Deflection, Checking Of Fuel Pump Timing And Rocker Arm Tappet Setting.
  • 9) Assembly of Cylinder Head, Piston Connecting Rod Etc.